Modify ↓
Opened 14 years ago
Closed 14 years ago
#7487 closed enhancement (fixed)
Add multiple test plans capability
Reported by: | Roberto Longobardi | Owned by: | Roberto Longobardi |
---|---|---|---|
Priority: | normal | Component: | TestManagerForTracPlugin |
Severity: | normal | Keywords: | |
Cc: | Ryan J Ollos | Trac Release: | 0.11 |
Description
In the long run, it would be useful (but not trivial to
implement) to differentiate between the definition of the tests and running a test campaign. An example: I have a software product, a plugin for Trac. Before doing a release "1.0" I have to perform some interactive tests. Therefore I start a new test campaign with svn revision 1234, where all test verdicts "Untested". Let's say, one or two tests failed. I conclude the test campaign unsuccessful. Now I have to fix the bugs and have to start a new test campaign, again with all test verdicts set to "Untested".
Attachments (0)
Change History (4)
comment:1 Changed 14 years ago by
Cc: | Ryan J Ollos added; anonymous removed |
---|---|
Owner: | changed from Roberto Longobardi to Ryan J Ollos |
Status: | new → assigned |
comment:2 Changed 14 years ago by
Owner: | changed from Ryan J Ollos to Roberto Longobardi |
---|---|
Status: | assigned → new |
comment:4 Changed 14 years ago by
Resolution: | → fixed |
---|---|
Status: | new → closed |
Note: See
TracTickets for help on using
tickets.
Sorry, was just trying to add myself to cc list and accidentally reassigned the ticket to myself.