#1249 new enhancement
Let the whole timeline be shown
Reported by: | tote | Owned by: | daan |
---|---|---|---|
Priority: | normal | Component: | ScrumBurndownPlugin |
Severity: | normal | Keywords: | |
Cc: | Trac Release: | 0.10 |
Description
It would be great if we could see the whole timeline from the very beginning so that we would always see what we're approaching to (in terms of # of days). In other words, the whole X-axis should be shown from the very beginning so that we would always know if our work efforts are close to the ideal or not.
Attachments (0)
Change History (10)
comment:1 follow-up: 2 Changed 18 years ago by
comment:2 Changed 18 years ago by
Replying to anonymous:
since sprints usually have a defined target end date, it would be nice if the plugin accepted such as input to determine how big such a graph would be (and then, optionally, draw a straight line from start to finish to show the ideal progression of the burndown).
I second this idea.
comment:3 Changed 18 years ago by
My vote goes for this one. Current implementation does not provide a easy overview. If target day was displayed, we could pick up the pace early on if there is an indication that we're not on ideal track.
comment:4 follow-up: 5 Changed 16 years ago by
Owner: | changed from Sam Bloomquist to daan |
---|
comment:5 Changed 16 years ago by
Replying to daan:
Any updates on this ticket, guys? When will it be fixed?
comment:6 follow-up: 7 Changed 16 years ago by
Hi tote,
This ticket is the displaying of an 'estimated' ideal burndown line, right? I have that functionality written in the past, but it is not yet integrated. Please read my post at my weblog. Basically I have to port the plugin to a better javascript library, then I can port my changes to it. Will be working on this!
Daan
comment:7 Changed 16 years ago by
Replying to daan:
Hi tote,
This ticket is the displaying of an 'estimated' ideal burndown line, right? I have that functionality written in the past, but it is not yet integrated. Please read my post at my weblog. Basically I have to port the plugin to a better javascript library, then I can port my changes to it. Will be working on this!
Daan
Cool, thanks! Looking forward to it!
comment:8 Changed 16 years ago by
I don't think this ticket is "just" looking for an estimated/ideal burndown line; it's looking for the chart to include days even on which no work was done. Perhaps you could include a checkbox option to the effect of "Include all days" that causes the chart to be generated with every day from the start date to the end date included in it.
I too, would greatly appreciate such a feature.
comment:9 Changed 15 years ago by
I would also appreciate it if the chart were to include days even on which no work was done, and extended its x-axis out to the milestone date.
comment:10 Changed 15 years ago by
I really would like to see this feature.
Along with a general aesthetic spruce this is my biggest gripe with this plugin.
since sprints usually have a defined target end date, it would be nice if the plugin accepted such as input to determine how big such a graph would be (and then, optionally, draw a straight line from start to finish to show the ideal progression of the burndown).